Ravi can paint a wall in hours. What part of the wall does he paint in 1 hour?1 mark
Answer and solution
Ravi paints the whole wall in hours.
∴ Ravi's 1 hour's work
Answer: of the wall
-
A is thrice as good a workman as B. If B can finish a piece of work in days, in how many days can A finish it?1 mark
Answer and solution
Time taken by A (Time taken by B)
days
Answer: days
-
A piece of work is done by men. If men do the same work instead, find the ratio of the time taken by the men to the time taken by the men.1 mark
Answer and solution
No. of men
∴
Answer:
-
men can finish a piece of work in hours. In how many hours can men finish the same work?2 marks
Answer and solution
No. of men
hours
Answer: hours
-
A can do a piece of work in days and B can do it in days. Find (A + B)'s 1 day's work.1 mark
Answer and solution
(A + B)'s 1 day's work
Answer:
-
A can finish a piece of work in days and B can finish it in days. In how many days can they finish it working together?2 marks
Answer and solution
A's 1 day's work
B's 1 day's work
∴ (A + B)'s 1 day's work
∴ Both together can finish the work in days days
Answer: days
-
A and B can do a piece of work in days; B and C in days; C and A in days. In how many days will they finish it together and separately?5 marks
Answer and solution
(A + B)'s 1 day's work
(B + C)'s 1 day's work
(C + A)'s 1 day's work
Adding, 2(A + B + C)'s 1 day's work
⇒ (A + B + C)'s 1 day's work
∴ A, B, C together can finish the work in days.
A's 1 day's work , so A alone takes days
B's 1 day's work , so B alone takes days
C's 1 day's work , so C alone takes days
Answer: Together days; A alone days, B alone days, C alone days
-
A is twice as good a workman as B and is therefore able to finish a piece of work in days less than B. Find the time in which they can do it working together.3 marks
Answer and solution
Suppose B finishes the work in days
⇒ A is able to finish it in days
Time taken by A (Time taken by B)
∴
⇒ ⇒
∴ Time taken by B days, time taken by A days
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
A and B together can finish the work in days
Answer: days
-
A and B can do a piece of work in and days respectively. They began the work together, but A leaves after some days and B finishes the remaining work in days. After how many days did A leave?3 marks
Answer and solution
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
B's 22 days' work
Remaining work
(A + B)'s days' work ⇒
, so A left after days
Answer: days
-
A can do a piece of work in days and B can do it in days. They work together for days. Then B leaves and A alone continues the work. days after that, C joins A and the work is completed in days more. In how many days can C do the work alone?5 marks
Answer and solution
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
(A + B)'s 30 days' work
A's 8 days' work
(A + C)'s 18 days' work
⇒ (A + C)'s 1 day's work
C's 1 day's work
C can finish the work in days
Answer: days
-
A certain number of men complete a piece of work in days. If there were men more, the work could be finished in days less. How many men were there originally?2 marks
Answer and solution
Let the original number of men be
No. of men
⇒
Answer: men
-
If men or boys can finish a piece of work in days, in how many days can men and boys finish it?2 marks
Answer and solution
men boys
men boys
men + boys boys + boys boys
No. of boys
⇒ days
Answer: days
-
If men with boys can earn ₹2025 in days and men with boys can earn ₹3795 in days, in what time will men with boys earn ₹2025?5 marks
Answer and solution
Let 1 man earn ₹ and 1 boy earn ₹ in 1 day.
⇒
⇒
(1) ⇒
(1) (2) ⇒ ⇒
From (1): ⇒
⇒ ⇒
⇒ days
Answer: days
-
A can do half as much again as B can do in the same time. B alone can do a piece of work in days. In how many days can both together finish it?3 marks
Answer and solution
If B does , A does in the same time
Ratio of working of A and B
Ratio of time taken for the same work
Time taken by B ⇒
Time taken by A days
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
Time taken by (A + B) to finish the work days
Answer: days
-
The speed of a boat in still water is km/hr and the speed of the stream is km/hr. Find the speed of the boat upstream.1 mark
Answer and solution
Speed upstream km/hr
km/hr
Answer: km/hr
-
A man can row downstream at the rate of km/hr and upstream at km/hr. Find the man's rate in still water and the rate of the current.2 marks
Answer and solution
Let the man's rate in still water be km/hr and the rate of the current be km/hr.
Given and
Adding, ⇒ km/hr
Subtracting, ⇒ km/hr
Answer: Rate in still water km/hr, rate of current km/hr
-
A boat goes km downstream in hours. Find its speed downstream.1 mark
Answer and solution
Speed
km/hr
Answer: km/hr
-
The rate of a stream is km/hr. A man finds that it takes him thrice as long to row up the river as to row down. Find the man's rate in still water.2 marks
Answer and solution
Let the man's rate in still water be km/hr
Same distance, thrice the time, so speed down speed up
Given
⇒ ⇒
⇒ km/hr
Answer: km/hr
-
A man can row km/hr in still water. If the river is running at km/hr, it takes him 2 hours 30 minutes to row to a place and back. How far is the place?3 marks
Answer and solution
Let the required distance be km
Speed downstream km/hr
Speed upstream km/hr
Total time 2 hours 30 minutes hours
Time , so
⇒
⇒
⇒ km
Answer: km
-
The current of a stream runs at the rate of km/hr. A motor boat goes km upstream and back again to the starting point in 1 hour 25 minutes. Find the speed of the motor boat in still water.5 marks
Answer and solution
Let the speed of the boat in still water be km/hr
Speed upstream km/hr, speed downstream km/hr
Total time min hr hr
⇒
⇒
⇒
⇒
⇒
⇒ (or) (rejected, a speed cannot be negative)
∴ Speed of the boat in still water km/hr
Answer: km/hr