Download the PDF (with key sheet and solutions, 105.2 KB)
Work each question on paper first, then open its answer and solution to check your work.
-
B's 1 day's work is . In how many days can B finish the whole work?1 mark
Answer and solution
B does of the work in 1 day.
∴ B finishes the whole work in days.
Answer: days
-
A is twice as good a workman as B. A can finish a piece of work in days. How many days will B take to finish it?1 mark
Answer and solution
Time taken by A (Time taken by B)
(Time taken by B)
∴ Time taken by B days
Answer: days
-
A piece of work is done by men. If men do the same work instead, find the ratio of the time taken by the men to the time taken by the men.1 mark
Answer and solution
No. of men
∴
Answer:
-
men can do a piece of work in days. How many men are needed to finish it in days?2 marks
Answer and solution
No. of men
men
Answer: men
-
A can do a piece of work in days and B can do it in days. Find (A + B)'s 1 day's work.1 mark
Answer and solution
(A + B)'s 1 day's work
Answer:
-
A and B together can do a piece of work in days. B alone can finish it in days. In how many days can A alone finish the work?2 marks
Answer and solution
(A + B)'s 1 day's work
B's 1 day's work
⇒ A's 1 day's work
∴ A alone can finish the work in days.
Answer: days
-
A can do a piece of work in days and B can finish it in days. They work together for days and then B goes away. In how many days will A finish the remaining work?3 marks
Answer and solution
A's 1 day's work
B's 1 day's work
(A + B)'s 1 day's work
(A + B)'s 12 days' work
Remaining work
This work is done by A in days
Answer: days
-
A can do a piece of work in days and B in days. They work together for days. The rest of the work is finished by C in days. If they get ₹1260 for the whole work, how should they divide the money? Also find their daily wages.5 marks
Answer and solution
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
(A + B)'s 10 days' work
Remaining work , done by C in days
A's 10 days' work , B's 10 days' work , C's 7 days' work
Consider
A's share , i.e. ₹700
B's share , i.e. ₹350
C's share , i.e. ₹210
A's daily wage , i.e. ₹70
B's daily wage , i.e. ₹35
C's daily wage , i.e. ₹30
Answer: Shares: A ₹700, B ₹350, C ₹210; daily wages: A ₹70, B ₹35, C ₹30
-
A can do a piece of work in days, B in days and C in days. All begin together, but A leaves the work after day and B leaves days before the work is finished. How long did the work last?5 marks
Answer and solution
A's 1 day's work , B's , C's
A, B, C together work for day; C alone works for the last days; B and C work together in between.
(A + B + C)'s 1 day's work
C's 4 days' work
Remaining work
(B + C)'s 1 day's work
Remaining work is done by (B + C) in days
Total time days
Answer: days
-
A and B working alone can finish a piece of work in and days respectively. If they work at it alternately for a day, A beginning, in how many days will the work be finished?3 marks
Answer and solution
A's 1 day's work , B's 1 day's work
Work done in the first 2 days
Work done in the first 10 days
On day 11 it is A's turn: work done in the first 11 days
Remaining work
B does it in day
∴ Total no. of days days
Answer: days
-
A certain number of men complete a piece of work in days. If there were men more, the work could be finished in days less. How many men were there originally?2 marks
Answer and solution
Let the original number of men be
No. of men
⇒
Answer: men
-
If men or boys can finish a piece of work in days, in how many days can men and boys finish it?2 marks
Answer and solution
men boys
men boys
men + boys boys + boys boys
No. of boys
⇒ days
Answer: days
-
men and women working hours a day finish a piece of work in days; men and women working hours a day do the same work in days. Find the number of days in which the work is done by men only, working hours a day.5 marks
Answer and solution
Let 1 man do and 1 woman do units of work in 1 hour.
Case (i):
Case (ii):
Same work:
⇒ ⇒
So women men, and men
men working hours a day for days do the same work as men working hours a day for days
⇒ days
Answer: days
-
A can do half as much again as B can do in the same time. A alone can do a piece of work in days. In how many days can both together finish it?3 marks
Answer and solution
If B does , A does in the same time
Ratio of working of A and B
Ratio of time taken for the same work
Time taken by A ⇒
Time taken by B days
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
Time taken by (A + B) to finish the work days
Answer: days
-
A man rows in still water at km/hr and the rate of the current is km/hr. Find the man's rate with the current.1 mark
Answer and solution
Speed downstream km/hr
km/hr
Answer: km/hr
-
A boat goes km upstream in hours. Find its speed upstream.1 mark
Answer and solution
Speed
km/hr
Answer: km/hr
-
A man rows upstream km and downstream km, taking hours each time. What is the man's speed in still water?2 marks
Answer and solution
Speed downstream: km/hr
Speed upstream: km/hr
Adding,
km/hr
Answer: km/hr
-
A man can row km/hr in still water and he finds that it takes him twice as long to row up as to row down the river. Find the rate of the stream.2 marks
Answer and solution
Let the rate of the stream be km/hr
Same distance, twice the time, so speed down speed up
Given
⇒ ⇒
⇒ km/hr
Answer: km/hr
-
A man can row km/hr in still water. If the river is running at km/hr, it takes him 2 hours 30 minutes to row to a place and back. How far is the place?3 marks
Answer and solution
Let the required distance be km
Speed downstream km/hr
Speed upstream km/hr
Total time 2 hours 30 minutes hours
Time , so
⇒
⇒
⇒ km
Answer: km
-
A man can row km upstream and km downstream in hours, while he can row km upstream and km downstream in hours. Find the rate of the current and the speed of the man in still water.5 marks
Answer and solution
Let the speed of the man in still water be km/hr and the rate of the current km/hr.
Speed upstream km/hr, speed downstream km/hr. Put ,
⇒
⇒
(1) ⇒ ; (2) ⇒
(2) (1) ⇒ ⇒
From (1): ⇒ ⇒
So and
Adding, ⇒ ; then
∴ Rate of the current km/hr, speed in still water km/hr
Answer: Rate of current km/hr, speed in still water km/hr