Download the PDF (with key sheet and solutions, 107.3 KB)
Work each question on paper first, then open its answer and solution to check your work.
-
Ravi can paint a wall in hours. What part of the wall does he paint in 1 hour?1 mark
Answer and solution
Ravi paints the whole wall in hours.
∴ Ravi's 1 hour's work
Answer: of the wall
-
A is twice as good a workman as B. A can finish a piece of work in days. How many days will B take to finish it?1 mark
Answer and solution
Time taken by A (Time taken by B)
(Time taken by B)
∴ Time taken by B days
Answer: days
-
A piece of work is done by men. If men do the same work instead, find the ratio of the time taken by the men to the time taken by the men.1 mark
Answer and solution
No. of men
∴
Answer:
-
A can do a piece of work in days and B can do it in days. Find (A + B)'s 1 day's work.1 mark
Answer and solution
(A + B)'s 1 day's work
Answer:
-
A can do a piece of work in days and B alone can do it in days. How much time will both take to finish the work?2 marks
Answer and solution
A's 1 day's work
B's 1 day's work
∴ (A + B)'s 1 day's work
∴ Both together can finish the work in days days
Answer: days
-
A and B together can do a piece of work in days. B alone can finish it in days. In how many days can A alone finish the work?2 marks
Answer and solution
(A + B)'s 1 day's work
B's 1 day's work
⇒ A's 1 day's work
∴ A alone can finish the work in days.
Answer: days
-
A can do a piece of work in days while B alone can do it in days. With the help of C they can finish it in days. If they are paid ₹6960 for the whole work, how should the money be divided among them?5 marks
Answer and solution
A's 1 day's work
B's 1 day's work
(A + B)'s 1 day's work
Given (A + B + C)'s 1 day's work
C's 1 day's work
Consider
∴ ₹6960 must be divided in the ratio ()
A's share , i.e. ₹3480
B's share , i.e. ₹2030
C's share , i.e. ₹1450
Answer: A ₹3480, B ₹2030, C ₹1450
-
A is twice as good a workman as B and is therefore able to finish a piece of work in days less than B. Find the time in which they can do it working together.3 marks
Answer and solution
Suppose B finishes the work in days
⇒ A is able to finish it in days
Time taken by A (Time taken by B)
∴
⇒ ⇒
∴ Time taken by B days, time taken by A days
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
A and B together can finish the work in days
Answer: days
-
A and B together can do a piece of work in days. B and C together can do it in days. If A is twice as good a workman as C, find in what time B alone can do it.3 marks
Answer and solution
(A + B)'s 1 day's work , (B + C)'s 1 day's work
A's 1 day's work C's 2 days' work
C's 2 days' work + B's 1 day's work
⇒ C's 1 day's work + (B + C)'s 1 day's work
⇒ C's 1 day's work
C's 1 day's work
B's 1 day's work
∴ B alone can finish the work in days
Answer: days
-
A certain number of men complete a piece of work in days. If there were men more, the work could be finished in days less. How many men were there originally?2 marks
Answer and solution
Let the original number of men be
No. of men
⇒
Answer: men
-
If men or boys can finish a piece of work in days, in how many days can men and boys finish it?2 marks
Answer and solution
men boys
men boys
men + boys boys + boys boys
No. of boys
⇒ days
Answer: days
-
If men with boys can earn ₹5340 in days and men with boys can earn ₹13120 in days, in what time will men with boys earn ₹11900?5 marks
Answer and solution
Let 1 man earn ₹ and 1 boy earn ₹ in 1 day.
⇒
⇒
(1) ⇒
(1) (2) ⇒ ⇒
From (1): ⇒
⇒ ⇒
⇒ days
Answer: days
-
men are employed to do a piece of work which they could finish in days, but the men drop off by at the end of every days. In what time will the work be completed?5 marks
Answer and solution
Work done by 60 men in 4 days
So 1 man's work in 4 days
Remaining work , remaining men ; work done by 57 men in 4 days
Remaining work , remaining men ; work done by 54 men in 4 days
work is done by 54 men in days
Total time days
Answer: days
-
A can do half as much again as B can do in the same time. B alone can do a piece of work in days. In how many days can both together finish it?3 marks
Answer and solution
If B does , A does in the same time
Ratio of working of A and B
Ratio of time taken for the same work
Time taken by B ⇒
Time taken by A days
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
Time taken by (A + B) to finish the work days
Answer: days
-
A man rows in still water at km/hr and the rate of the current is km/hr. Find the man's rate with the current.1 mark
Answer and solution
Speed downstream km/hr
km/hr
Answer: km/hr
-
A man can row downstream at the rate of km/hr and upstream at km/hr. Find the man's rate in still water and the rate of the current.2 marks
Answer and solution
Let the man's rate in still water be km/hr and the rate of the current be km/hr.
Given and
Adding, ⇒ km/hr
Subtracting, ⇒ km/hr
Answer: Rate in still water km/hr, rate of current km/hr
-
A boat goes km downstream in hours. Find its speed downstream.1 mark
Answer and solution
Speed
km/hr
Answer: km/hr
-
A man rows upstream km and downstream km, taking hours each time. What is the velocity of the current?2 marks
Answer and solution
Speed downstream: km/hr
Speed upstream: km/hr
Subtracting,
km/hr
Answer: km/hr
-
A man can row km/hr in still water. If the river is running at km/hr, it takes him 3 hours to row to a place and back. How far is the place?3 marks
Answer and solution
Let the required distance be km
Speed downstream km/hr
Speed upstream km/hr
Time , so
⇒
⇒
⇒ km
Answer: km
-
The current of a stream runs at the rate of km/hr. A motor boat goes km upstream and back again to the starting point in 1 hour 20 minutes. Find the speed of the motor boat in still water.5 marks
Answer and solution
Let the speed of the boat in still water be km/hr
Speed upstream km/hr, speed downstream km/hr
Total time min hr hr
⇒
⇒
⇒
⇒
⇒
⇒ (or) (rejected, a speed cannot be negative)
∴ Speed of the boat in still water km/hr
Answer: km/hr