Download the PDF (with key sheet and solutions, 102.1 KB)
Work each question on paper first, then open its answer and solution to check your work.
-
If A can finish a piece of work in days, find A's 1 day's work.1 mark
Answer and solution
A finishes the whole work in days.
β΄ A's 1 day's work
Answer:
-
A is thrice as good a workman as B. A can finish a piece of work in days. How many days will B take to finish it?1 mark
Answer and solution
Time taken by A (Time taken by B)
(Time taken by B)
β΄ Time taken by B days
Answer: days
-
If the number of men to do a work is changed in the ratio , find the ratio in which the time taken by them to finish the work changes.1 mark
Answer and solution
No. of men
β΄
Answer:
-
men can do a piece of work in days. How many men are needed to finish it in days?2 marks
Answer and solution
No. of men
men
Answer: men
-
A can do a piece of work in days and B can do it in days. Find (A + B)'s 1 day's work.1 mark
Answer and solution
(A + B)'s 1 day's work
Answer:
-
A can do a piece of work in days and B alone can do it in days. How much time will both take to finish the work?2 marks
Answer and solution
A's 1 day's work
B's 1 day's work
β΄ (A + B)'s 1 day's work
β΄ Both together can finish the work in days days
Answer: days
-
A and B together can do a piece of work in days. B alone can finish it in days. In how many days can A alone finish the work?2 marks
Answer and solution
(A + B)'s 1 day's work
B's 1 day's work
β A's 1 day's work
β΄ A alone can finish the work in days.
Answer: days
-
A and B can do a piece of work in days; B and C in days; C and A in days. In how many days will they finish it together and separately?5 marks
Answer and solution
(A + B)'s 1 day's work
(B + C)'s 1 day's work
(C + A)'s 1 day's work
Adding, 2(A + B + C)'s 1 day's work
β (A + B + C)'s 1 day's work
β΄ A, B, C together can finish the work in days.
A's 1 day's work , so A alone takes days
B's 1 day's work , so B alone takes days
C's 1 day's work , so C alone takes days
Answer: Together days; A alone days, B alone days, C alone days
-
A can do a piece of work in days and B can finish it in days. They work together for days and then A goes away. In how many days will B finish the remaining work?3 marks
Answer and solution
A's 1 day's work
B's 1 day's work
(A + B)'s 1 day's work
(A + B)'s 11 days' work
Remaining work
This work is done by B in days
Answer: days
-
A and B can do a piece of work in and days respectively. They began the work together, but B leaves after some days and A finishes the remaining work in days. After how many days did B leave?3 marks
Answer and solution
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
A's 12 days' work
Remaining work
(A + B)'s days' work β
, so B left after days
Answer: days
-
A can do a piece of work in days and B can do it in days. They work together for days. Then B leaves and A alone continues the work. days after that, C joins A and the work is completed in days more. In how many days can C do the work alone?5 marks
Answer and solution
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
(A + B)'s 26 days' work
A's 13 days' work
(A + C)'s 24 days' work
β (A + C)'s 1 day's work
C's 1 day's work
C can finish the work in days
Answer: days
-
A certain number of men complete a piece of work in days. If there were men more, the work could be finished in days less. How many men were there originally?2 marks
Answer and solution
Let the original number of men be
No. of men
β
Answer: men
-
men and women working hours a day finish a piece of work in days; men and women working hours a day do the same work in days. Find the number of days in which the work is done by men only, working hours a day.5 marks
Answer and solution
Let 1 man do and 1 woman do units of work in 1 hour.
Case (i):
Case (ii):
Same work:
β β
So women men, and men
men working hours a day for days do the same work as men working hours a day for days
β days
Answer: days
-
A can do half as much again as B can do in the same time. B alone can do a piece of work in days. In how many days can both together finish it?3 marks
Answer and solution
If B does , A does in the same time
Ratio of working of A and B
Ratio of time taken for the same work
Time taken by B β
Time taken by A days
A's 1 day's work , B's 1 day's work
(A + B)'s 1 day's work
Time taken by (A + B) to finish the work days
Answer: days
-
The speed of a boat in still water is km/hr and the speed of the stream is km/hr. Find the speed of the boat upstream.1 mark
Answer and solution
Speed upstream km/hr
km/hr
Answer: km/hr
-
A man can row downstream at the rate of km/hr and upstream at km/hr. Find the man's rate in still water and the rate of the current.2 marks
Answer and solution
Let the man's rate in still water be km/hr and the rate of the current be km/hr.
Given and
Adding, β km/hr
Subtracting, β km/hr
Answer: Rate in still water km/hr, rate of current km/hr
-
A boat goes km downstream in hours. Find its speed downstream.1 mark
Answer and solution
Speed
km/hr
Answer: km/hr
-
A man can row km/hr in still water and he finds that it takes him thrice as long to row up as to row down the river. Find the rate of the stream.2 marks
Answer and solution
Let the rate of the stream be km/hr
Same distance, thrice the time, so speed down speed up
Given
β β
β km/hr
Answer: km/hr
-
A man can row km/hr in still water. If the river is running at km/hr, it takes him 1 hour 30 minutes to row to a place and back. How far is the place?3 marks
Answer and solution
Let the required distance be km
Speed downstream km/hr
Speed upstream km/hr
Total time 1 hour 30 minutes hours
Time , so
β
β
β km
Answer: km
-
A man can row km upstream and km downstream in hours, while he can row km upstream and km downstream in hours. Find the rate of the current and the speed of the man in still water.5 marks
Answer and solution
Let the speed of the man in still water be km/hr and the rate of the current km/hr.
Speed upstream km/hr, speed downstream km/hr. Put ,
β
β
(1) β
(1) (2) β β
From (1): β β
So and
Adding, β ; then
β΄ Rate of the current km/hr, speed in still water km/hr
Answer: Rate of current km/hr, speed in still water km/hr